Specifications include, but are not limited to: Demolition: - Demolition, removal and disposal of the existing wooden toilet facility and vault. - La Crosse County will arrange for vault to be pumped prior to demolition. - La Crosse County will disconnect electrical to building prior to demolition. - Timeframe of demolition must coordinate with building installation date. County will provide at minimum a two-week lead-time for required completion date. Building: - Building will be a dual privy. - Building will be manufactured using concrete including the roof and fabricated to meet all local building codes requirements and to withstand heavy snow and high wind as happens in our region. - Building design, materials, and material placement in each stall to meet A.D.A - Paint to conform to all federal specifications or be similar “top-of-the-line components,” water repellant and appropriate for application to concrete.