2) Scope of Services Identified tasks/key deliverables for the project include the following: a. Advisory to the County Staff Project Team b. Remove the current generator and turn it over to Vernon County. c. Install a new 200 kW diesel engine-driven generator, set with turbocharges/aftercooled 6-cylinder 8.7L engine (or equivalent to the current generator), on the existing pad. d. Install a new 800A service transfer switch in place of the existing switch. e. This generator has a secondary transfer switch located in the Banta building that works in conjunction with the main transfer switch located in the Courthouse/Annex Building. This will also need to be replaced. f. Provide power to the buildings during the exchange of equipment. g. Terminate wiring and test. h. Onsite training i. Obtain necessary permits.