Specifications include, but are not limited to: Furnish and Install 8-Inch PVC Sanitary Sewer 960 LF; Furnish and Install 8-Inch PVC Water Main 1,120 LF; Furnish and Install 24-Inchx38-Inch Elliptical RCP Storm Sewer 240 LF; Furnish and Install RCP Storm Sewer (12-inch to 36-Inch) 950 LF; Furnish and Place 24-Inch Concrete Curb and Gutter 2,700 LF; Furnish and Place 4-Inch Concrete Sidewalk 3,000 SF; Paint Pavement Marking – 4-Inch Yellow 880 LF; Furnish and Place Base Aggregate Dense, 1-1/4-Inch, 4-Inch Depth 2,300 TON; Furnish and Place Base Aggregate Dense, 3-Inch, 8-Inch Depth 2,600 TON; Furnish and Place 5-Inch Hot Mix Asphalt Pavement 1,550 TON; Furnish and Place Topsoil, Seed, Fertilizer, Mulch, and Water, 6-Inch 2,700 SY; Stump Removal, 6-Inch and Above 7 EA.