The work generally consists of the following: Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Sanitary Manhole Adjustment – 4 EA, Manhole Adjustment – 5 EA, Storm Inlet Adjustment – 12 EA, Pavement Sawing – 1,250 LF, Concrete Walk Removal – 895 SF, Driveway Pavement Removal – 375 SF, Concrete Curb & Gutter Removal – 494 LF, Pavement Removal/Excavation/Grading – 663 CY, Dense Graded Base (3/4”) – 76 TON, Dense Graded Base (1-1/4”) – 569 TON, Crushed Limestone Chips (3/4”) – 41 TON, 31” Concrete Curb & Gutter – 494 LF, 5” Concrete Sidewalk – 895 SF, 7” Concrete Driveway – 14 SY, 7” Concrete Pavement – 123 SY, 8” Concrete Pavement – 8 SY, 9” Concrete Pavement – 365 SY, Detectable Warning Field, Yellow – 30 SF, Pavement Marking, Epoxy, White, 6-inch – 187 LF, Pavement Marking, Epoxy, Yellow, 4-inch – 389 LF, Pavement Marking, Epoxy, White, 8-inch – 256 LF, Pavement Marking, Stop Line, Epoxy, 18-inch – 41 LF, Pavement Marking, Word, Epoxy – 3 EA, Pavement Marking, Arrows, Type 1, Epoxy – 2 EA, Pavement Marking, Arrows, Type 2, Epoxy – 4 EA, 6” PVC Perforated Underdrain – 134 LF, Valve Adjustment – 4 EA