Remove and dispose of the existing fencing, 280-ton chiller, and its identified components, following environmental and safety regulations. • Furnish and install a new air-cooled chiller, two (2) 46 HP new chiller water pumps and necessary components that include voltage protection, piping, insulation, strainer, stands, flow indication, filters, dryers, valves, flanges, gauges, fittings, electrical, signage, coil corrosion coating(s), taps for supply and return with appropriate valves for potential futuristic temporary chiller hookup, following the manufacturer's instructions. Accepted manufacturers include Trane, Carrier, York or Eqoel. • The Contractor may use the existing disconnects if permissible. • The existing controls will be disconnected by the Contractor. Reconnection shall be the Contractor's responsibility to coordinate with Energy Control & Design, at the Contractor's expense. • Balance, calibrate and perform start up to achieve optimal efficiency and performance. • Provide all documentation and submittals, including any drawings, required clearances, location of field connections, manuals, warranty, and maintenance schedules. • Provide one onsite training session to appropriate staff for maintenance and operation of the new chiller. • Provide a one-year warranty that includes any and all parts and labor. Post-installation warranty response time shall be within a 24-hour period after initial contact by Owner. • Provide an additional five-year part only warranty. • Contractor is responsible for all licenses for State and local permits.