The work to be completed in conformance with the Contract Documents for the mentioned project includes asphalt removal/milling and repaving. The project work includes the following areas: Lamboley Avenue – Shore Acres Road to Schofield Street; Owen Road – Winnequah Road to Midmoor Road; Owen Road – at Pheasant Hill; Winnequah Road – Bridge Road to Bartels Street (partial LRIP grant funding); This Work shall consist of mobilization, construction staking to ensure desired cross slopes, milling, preparing foundation for asphaltic paving, 1½ inches of HMA pavement LT 58-28 S, tack coat, traffic control, joint filling and sawing asphalt all in accordance with the requirements of the State of Wisconsin Standard Specifications for Highway and Structure Construction, current edition. Aggregate for both lower and upper layer shall be 12.5 mm (½-inch nominal), and aggregates for upper layers less than 1.75 inches thick shall be 9.5 mm (⅜-inch nominal), unless prior approvals by the City of Monona for deviation in mix design. Figures showing project limits and typical sections are located in Appendix C for reference.