Specifications include, but are not limited to: The 2019 Lead Abatement project will prepare existing painted surfaces for repainting while providing lead abatement measures to facilitate the surface prep work. The surfaces that require preparation for painting are located in Primary Gallery 1. Pipes, pumps, valves and appurtenances installed in 1961 and 1973 were coated with lead base paint. The extent of the pipe to be prepped is limited to the interior of Primary Gallery 1. MMSD will remove non-fixed items from the work area. Water and electrical power will be provided by MMSD All work must be performed in strict adherence to the attached Lead Paint Compliance Plan. The Contractor must provide lead containment control for the duration of the work. Contractor shall store lead-containing waste in approved containers. Contractor will provide an insured and licensed transporter of hazardous waste to transport these containers to a secured licensed hazardous waste landfill.