Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 8,907.000 _________._____ _________._____ 0015 207033-000 FABRIC FOR SUBGRADE STABILIZATION SY 17,505.000 _________._____ _________._____ 0020 207034-000 FABRIC FOR SEPARATION (retaining wall) SY 45.000 _________._____ _________._____ 0025 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 990.000 _________._____ _________._____ 0030 211008-000 ROCK BORROW EXCAVATION TN 1,367.000 _________._____ _________._____ 0035 212005-000 SELECT MATERIAL FOR BACKFILLING (retaining wall) CY 14.000 _________._____ _________._____ 0040 229001-000 SHOULDERS AND DITCHES MI 7.400 _________._____ _________._____ 0045 240001-000 CLEAN CULVERT LF 30.000 _________._____ _________._____ 0050 240002-000 CLEAN INLET EA 7.000 _________._____ _________._____ 0055 408001-003 NON-TRACKING ASPHALT MATERIAL GA 5,030.000 _________._____ _________._____ 0060 415005-001 STANDARD MILLING SY 42,857.000 _________._____ _________._____