Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 74.000 _________._____ _________._____ 0015 207034-000 FABRIC FOR SEPARATION SY 162.000 _________._____ _________._____ 0020 211009-000 SELECT BORROW EXCAVATION TN 150.000 _________._____ _________._____ 0025 229001-000 SHOULDERS AND DITCHES MI 0.060 _________._____ _________._____ 0030 408002-001 ASPHALT MATERIAL GA 51.000 _________._____ _________._____ 0035 607001-001 TYPE 1 GUARDRAIL, CLASS 1 LF 175.000 _________._____ _________._____ 0040 607010-020 GUARDRAIL REMOVAL LF 175.000 _________._____ _________._____ 0045 614001-004 HP10X57 STEEL PILE LF 1,305.000 _________._____ _________._____ 0050 614003-001 CONCRETE LAGGING, THICKNESS 8", 3'9" SF 936.000 _________._____ _________._____ 0055 636009-002 TEMPORARY PAVEMENT MARKINGTAPE 6 IN, TY 6-WHITE LF 96.000 _________._____ _________._____ 0060 636011-001 TRAFFIC CONTROL DEVICE UN 3,180.000 _________._____ _________._____ 0065 636014-001 FLAGGER HR 400.000 _________._____ _________._____