Specifications include, but are not limited to: 1. The building has an EPDM membrane self-adhesive roof system. 2. On the roof, there are existing roof top units, makeup air units, refrigeration units, heating units, exhaust fans, vent pipes, sky lights, natural gas pipes, electrical conduit, etc. 3. The vendor must remove the existing metal roof edging and fascia and replace with new. Color will be selected after the contract has been awarded through the submittal process. 4. The vendor must remove the existing parapet coping and replace with new. Color will be selected after the contract has been awarded through the submittal process. 5. The vendor must only remove the amount of roofing that can be replaced back the same day. Vendor is responsible for securing all roof areas during construction. Vendor will be responsible for any damages caused from water leaks in any areas that are not watertight secured.