Specifications include, but are not limited to: A. At Central Regional Jail and Correctional Facility, there are two (2) existing hot waters heaters located in the mechanical room on the second floor of pod B, one (1) existing hot water heater located in the mop closet on the first floor of pod B, and one (1) existing hot water heater located in the mop closet on the first floor of pod A. The contractor must remove the existing four (4) hot water heaters and replace with new. Additional information on the project is listed below. B. Hot water heaters located in the mechanical room on second floor in pod B: 1. Existing hot water tank and burner assembly information for the two (2) hot water heaters, B1 and B2, located in the mechanical room in pod B: a) The existing hot water heaters are manufactured by PVI and where installed in 2007. b) The model no. is 500 P 225A-TP.