Specifications include, but are not limited to: clearing and grubbing at the site and burning the cleared and grubbed material to ash and removing all debris, trash, and garbage; construction, installation and maintenance of support areas and access roads to the site and coordination of work activities with local residents and complying with WVDOH rules and regulations; rehabilitation and cleaning of sediment control channels, to also include outlet rip-rap in select areas; backfill of approximately 8070 LF (1.53 miles) of mining highwall, ranging from 60 to 170 feet in height, to include some blasting, total backfill of approximately 1.9 mcyds; construction of underdrains; construction of drainage flumes; erosion and sediment control with best management practices to include silt fence, rock check dams, sumps, and rocked culvert outlet protection; revegetation of disturbed areas.