Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 10,450.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 2,211.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 11,305.000 _________._____ _________._____ 0030 211002-000 ROCK BORROW EXCAVATION CY 1,933.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 CY 57.000 _________._____ _________._____ 0040 311006-001 OPEN GRADED FREE DRAINING BASE COURSE CY 1,413.000 _________._____ _________._____ 0045 408002-001 ASPHALT MATERIAL GA 172.000 _________._____ _________._____ 0050 415005-001 STANDARD MILLING SY 3,433.000 _________._____ _________._____ 0055 508001-001 SAWING EXISTING CONCRETE PAVEMENT LF 8,498.000 _________._____ _________._____ 0060 601002-001 CLASS B CONCRETE CY 11.000 _