Specifications include, but are not limited to: The project will involve but is not limited to the upgrade of the existing lime silo and the construction of conveyance lines, rapid mix tank, pond cleaning and equipment upgrades, and sludge cell cleaning. • clearing and grubbing at the site; • construction and installation of support areas and access roads to the site and coordination of work activities with residents and complying with WVDOH rules and regulations; • upgrade of Existing Lime Silo; • regrading and excavation of the project site as approximated by the lines and grades shown on the Project Plans for constructing and/or updgrading treatment/sedimentation ponds/sludge cells, and the moving of all unsuitable or excess material to a Contractor-locate and/or WVDEP permitted waste disposal area; • construction of new conveyance lines and ditches; • erosion and sediment control with best management practices