Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 4,143.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 1,131.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 8,950.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 6,480.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 CY 1,340.000 _________._____ _________._____ 0040 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 846.000 _________._____ _________._____ 0045 311006-001 OPEN GRADED FREE DRAINING BASE COURSE CY 762.000 _________._____ _________._____ 0050 408002-001 ASPHALT MATERIAL GA 210.000 _________._____ _________._____ 0055 415006-001 FINE MILLING SY 1,812.000 _________._____ _________._____ 0060 502001-012 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB SY 560.000 _________._____ _________._____