Specifications include, but are not limited to: The Contractor shall perform all operations necessary for: • clearing and grubbing at the site and burning the cleared and grubbed material to ash and removing all debris, trash, and garbage; • construction and installation of support areas and access roads to the site and coordination of work activities with residents and complying with WVDOH rules and regulations; • installation of drainage channels and inlets; • upgrade of AMD Treatment Facility; • installation of limestone beds; • regrading and excavation of the project site as approximated by the lines and grades shown on the Project Plans for constructing and/or upgrading treatment/sedimentation ponds, and the moving of all unsuitable or excess material to a Contractor-locate and/or WVDEP permitted waste disposal area; • construction of new conveyance lines and ditches; • erosion and sediment control with best management practices to include silt fence, rock check dams, sumps, and rocked culvert outlet protection; • revegetation of disturbed areas to also include erosion control matting in select areas.