Specifications include, but are not limited to: An engineering firm to develop construction plans and specifications, bid documents, and provide construction administration and inspection services that include the replacement and repair of the roof, generator replacement, HVAC replacement and VAC Box updates, and electrical upgrades. The condition of the current roof is forcing this project to be divided into two phases: Phase one will consist of a rooftop replacement with the removal of the generator and replacement of HVAC units; Phase two will consist of controls, electrical, and generator replacement. This will prevent further damage to the interior due to the leaking roof but will still give time for a thorough investigation and solution to the controls, electrical, and generator replacement.