Specifications include, but are not limited to: 1. Mobilization/demobilization of personnel, equipment, and materials. 2. Erosion and sediment control measures including permitting. 3. Dewatering and water control. 4. Clearing and grubbing the waste area(s). 5. Stripping and stockpiling topsoil. 6. Excavation. 7. Fill (cohesive soil). 8. Reinforced concrete construction. 9. Rip Rap and Grouted Rip Rap placement. 10. Foot bridge removal and re-installation at Dam 2. 11. Riser and drain pipe grouting and abandonment at Dam 2. 12. Preserve and maintain existing monitoring wells at Dam 1 and abandon existing monitoring wells at Dam 2. 13. Spread topsoil, seeding, and mulching. 14. Place No. 1 Stone and Basestone on the existing access road as directed for stabilization by the Engineer. 15. Removal of erosion and sediment control measures after the disturbed area is revegetated.