Specifications include, but are not limited to: Provide supervision, labor and materials to complete to the University's satisfaction all work specified in the drawing and specifications provided. Demo existing fancoil unit and piping, VAV boxes, piping and controls, supply and return air ductwork, stainless steel exhaust ductwork, ceiling and lighting, plumbing supply and drainage, steam lines, vacuum, electrical conduit, wiring and devises, Aiphone, remove and replace ceilings, AHU#11 and associated ductwork, exhaust fan and associated ductwork, and other work as required to complete project. Install new AHU, ductwork, electrical connections, smoke detector, and Siemens controls. Install ductwork, balance dampers, diffusers, return grills, VAV's and reheat coils, exhaust fan, stainless steel ductwork as need, connect fume hood. Ductwork air system to be balanced. Electrical grounded wiring, conduit and wiring, VFD motor control, control wiring, lighting, emergency lighting, aiphone, electric for casework fixed and movable, motor control center. Cold and hot water piping, hot water and returning piping, gas, deionized water, and vacuum. Install and connect utilities and drains to lab sink, dish washing sink, fume hood, eyewash and combination shower.