Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 120.000 _________._____ _________._____ 0015 212005-000 SELECT MATERIAL FOR BACKFILLING CY 200.000 _________._____ _________._____ 0020 408002-001 ASPHALT MATERIAL GA 30.000 _________._____ _________._____ 0025 607009-001 TYPE 1 GUARDRAIL REMOVED AND RESET LF 200.000 _________._____ _________._____ 0030 614001-006 HP12X53 STEEL PILE LF 1,404.000 _________._____ _________._____ 0035 614003-001 CONCRETE LAGGING, THICKNESS 8 INCHES SF 720.000 _________._____ _________._____ 0040 636008-002 TEMPORARY PAVEMENT MARKINGPAINT 6 IN SOLID LINE LF 800.000 _________._____ _________._____ 0045 636011-001 TRAFFIC CONTROL DEVICE UN 880.000 _________._____ _________._____ 0050 636014-001 FLAGGER HR 380.000 _________._____ _________._____ 0055 639001-001 CONSTRUCTION LAYOUT STAKE LUMP SUM LUMP SUM _________._____ 0060 642004-002 SEED MIXTURE, B LB 8.000 _________._____ _________._____