• Demolition – Removal of existing press area tables, Mountaineer Athletic Club tables, and arena seating in sections outlined in the plans provided by SLAM. Arena seating is to be salvaged and turned over to WVU once removed. • Architecture – Installation of tables, millwork, beverage coolers, for premium seating areas. Finishes and paint for table panels and millwork are listed on plans. Countertop for premium seating areas is quartz. Press Area table area constructed of high-pressure laminate countertops. Finishes are within the plans provided by SLAM • Structural – Frame and pour concrete for additional platforms for loges, ledge and press areas. • Electrical –. Install 42 circuits for the premium seating areas from existing panel. Press area will get duplex outlet at each seat with USB ports.