Specifications include, but are not limited to: A.All preventive maintenance, repair parts, and labor needed to perform the inspection and preventive maintenance outlined in this proposal. B.Priority Emergency Services. 1.Contractor must guarantee priority response to all emergency calls, 7 days per week,24hoursperday.ThisappliestoallequipmentlistedinAttachment“C”.C.Quarterly inspections of boilers and rooftop units ($ inspections per contract period). 1.Check & record proper operating temperatures, pressures, and amperages. 2.Adjust operating safety controls. 3.Check operation of control circuit. 4.Review operating log with engineer. 5.Report to you any uncorrected deficiencies noted. Recommend upgrades to improve efficiency. 6.Advise engineer on cooling tower operation. 7.Check air cooled condenser. 8.Filter changes are the responsibility of the owner.