2.1. Provide a complete design including all engineering, including mechanical, structural and architectural disciplines to prepare construction bid documents for West Virginia State Purchasing. Key design elements for repair include but are not limited to concrete floors, gypsum walls, door assemblies, tile flooring and any item affected by the floor failure and subsidence. Other design elements are demolition, soil removal and disabling all systems in the affected area while maintaining a usable building in areas not affected. Design shall comply with all federal, state, military, and local codes and standards. 2.2. Designer shall provide all geotechnical work, if required, to include any necessary drill borings, designer shall be responsible for researching and investigating the location of existing underground and above ground utilities, and to provide drawings and specifications of all utility and road infrastructure as needed and directed by the owner and/or state agency, utility company or other utility approval authority for Elkins/Belington, West Virginia. 2.3. Drawings and specifications are to be submitted at 35%, 65%, 95% and 100%, cost estimates are to be revised and submitted with each submittal at 35%, 65%, 95% and 100%. 2.4. Provide construction bid services and administrative services to the Owner.