1.1 API# 47-085-02174 1. Notify Project Coordinator (PC) within 24 hours of plugging commencement. 2. Set cellar, break down well. Nipple up on 6” casing. 3. Pull 2” tubing. 4. Run sand line to find total depth (TD) @ 1634’ or approved by PC. 5. Run in hole (RIH) with work string. 6. Run 2sk gel followed by 200’ cement plug on bottom. Cover gas shows. 7. Tag all cement plugs, reset if needed. 8. Nipple up on 8” casing. 9. Pull or free point 6 ⅝” casing. 10. Run 2sx gel followed by 100’ cement plug at 1400’ casing seat. 11. Set 100’ cement plug @ 1000’. 12. Pull 8 ¼” casing, perf if unable to pull. 13. Set 100’ cement plug @ 850’. Casing seat and elevation. 14. Set 100’ cement plug @ 500’. 15. Pull 10” casing 16. Set cement plug 200’ to surface. 17. Set monument, 10’ below grade and 3’ above min 6” OD. 1.2 API# 47-085-05216 1. Notify Project Coordinator (PC) within 24 hours of plugging commencement. 2. Set cellar, break down well. Nipple up on 6” casing. 3. Pull 2” tubing. 4. Run sand line to find total depth (TD) @ 1634’ or approved by PC. 5. Run in hole (RIH) with work string. 6. Run 2sk gel followed by 200’ cement plug on bottom. Cover gas shows. 7. Tag all cement plugs, reset if needed. 8. Nipple up on 8” casing. 9. Pull or free point 6 ⅝” casing. 10. Run 2sx gel followed by 100’ cement plug at 1400’ casing seat. 11. Set 100’ cement plug @ 1000’. 12. Pull 8 ¼” casing, perf if unable to pull. 13. Set 100’ cement plug @ 850’. Casing seat and elevation. 14. Set 100’ cement plug @ 500’.