Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 235.000 _________._____ _________._____ 0015 207034-000 FABRIC FOR SEPARATION SY 300.000 _________._____ _________._____ 0020 211002-000 ROCK BORROW EXCAVATION CY 190.000 _________._____ _________._____ 0025 229001-000 SHOULDERS AND DITCHES MI 0.030 _________._____ _________._____ 0030 601002-001 CLASS B CONCRETE CY 62.000 _________._____ _________._____ 0035 606020-001 AGGREGATE FILLED FABRIC UNDERDRAIN, LF 130.000 _________._____ _________._____ 0040 607001-001 TYPE 1 GUARDRAIL, CLASS I LF 137.500 _________._____ _________._____ 0045 607065-001 FLARED END TERMINAL EA 2.000 _________._____ _________._____ 0050 614001-017 HP14X89 STEEL PILE LF 748.300 _________._____ _________._____ 0055 614001-055 W8X21STEEL PILE (Used For wale) LF 117.170 _________._____ _________._____ 0060 614003-001 CONCRETE LAGGING, THICKNESS 8" SF 952.000 _________._____ _________._____ 0065 639001-001 CONSTRUCTION LAYOUT STAKE LUMP SUM LUMP SUM