1. Installation of temporary traffic control devices and implementation of temporary lane closures. 2. Installation, maintenance, and removal of construction barriers and signage along with installation of shoring, temporary facilities and controls, and temporary protection required to maintain occupant access and egress during the work as shown in the Drawings and as required by Code. 3. Installation of temporary construction fencing. 4. Installation of temporary access and protection systems, including overhead protection, scaffolding, stairs, material hoists, and weather enclosures. 5. Storage of materials and equipment in designated areas to maintain access for building occupants and prevent impact on occupants or building activities. 6. Temporary protection of windows, mechanical, fire suppression and other building systems to remain within the 7 th floor of Building B. 7. Selective demolition of existing masonry parapets and walls, existing terra cotta coping and ornaments, and existing steel lintel angles. Existing brick masonry units and terra cotta coping and ornaments to be salvaged for reinstallation. 8. Selective demolition of existing gypsum concrete roof deck. 9. Demolition of existing stair bulkhead roof and walls. Existing brick masonry units to be salvaged for reinstallation. Existing open web steel joists to be salvaged for reinstallation.