Specifications include, but are not limited to: The contractor must remove the three existing CMU wall and foundation. The contractor must excavate and install a new bypass line with shutoff valves. The contractor must remove the existing bar screen system, conveyor system, and control panel. The contractor must make modifications to the existing open concrete structure. The contractor must install new concrete pad(s). The contractor must install a new auger monster system that includes a grinder, auger, screen, transport conveyor, and control panel(s). The contractor must install new water supply pipe and nozzle for the auger monster system. The contractor must install a new heat tape system for the exterior shell of the spiral auger and conveyor system. A