Specifications include, but are not limited to: 1. For all deliverables, the Consultant shall provide the following unless otherwise specified in a particular task: A. Draft and final of any plan, report, and technical memo B. Electronic copies of all deliverables (reports, specifications, technical memos, etc.) shall be in Microsoft (MS) Office Suite software and/or Portable Document Format (PDF) files. 1) PDFs shall be prepared in 600 dpi resolution. C. One bound printed copy (for reports, technical memoranda, and design documents). D. One unbound printed copy (of monthly progress reports/invoices and all bound documents). E. Hard copies of plans shall be 11 x 17. F. Hard copies of specifications, reports, technical memoranda, etc. shall be 8.5 x 11. 1) Exception of limited pages that necessitate 11 x 17. G. Draft agenda 5 business days before scheduled meetings or workshops. H. Draft meeting/workshop notes within 5 business days following the event. I. Updated action/decision logs 5 business days after each team meeting. 2. Plans/Drawings/Specifications shall meet the following standards: A. Electronic plan/drawing files: 1) Be provided in AutoCAD digital format as well as PDF files. 2) Computer-aided-design (CAD) files shall be prepared with AutoCAD Civil 3D, Architectural 3D, MEP, Revit, or AutoCAD 2017 version or later. CAD files shall be prepared in accordance with King County’s CAD Standards. Note: It is NOT acceptable to prepare CAD files with other software such as MicroStation and then export to AutoCAD format.