Specifications include, but are not limited to: Install new roofing drain assembly at each building footprint (10 total). Installing new gutters, down spouts and tight line system and connect new gutters and down spouts to new roof drain system. Install a new footing drain assembly at each building with a basement; seven locations total. This will involve excavating next to the building foot print, removal of bushes, shrubs and insignificant trees, installing a water proof drain mat system, installing perforated pipe and connecting to the existing storm drain on site. Provide and install additional top soils adjacent to the buildings in locations specified to raise the existing grade at the building footprint to establish positive slope away from the building.