Specifications include, but are not limited to: 1. Plow snow at all asphalted driveways and parking areas, (as identified on attached plan A-1), of the WSDOT, Euclid Avenue Complex. Snow shall be stockpiled at 7- locations within the site, as designated and approved by the Owner. 2. Hand-shovel and/or snow-blower removal of snow from sidewalks, walkways and entries at the NC Region Administration building A, Area 1 Office building B, and the Consolidated Shops building D, (as identified on attached plan A-1). This includes (21)-building entrances and approximately 2,000 lineal feet of sidewalk. 3. Apply dry ice-melt material at walkways and entries, (as identified on attached plan A-1). ** Snow Event Requiring Response Snow shall be plowed whenever snowfall is 1” or more deep. When possible, plowing, snow-blowing, and shoveling shall take place before 6:30am of each work day, (Monday through Friday), that snow is received. When conditions require it, additional plowing, shovel/blowing and deicing may be requested by the Owner.