Specifications include, but are not limited to: 1. Site security, fencing, Temporary Erosion and Sedimentation Control (TESC). 2. Protection of existing facilities to remain including tree and plant protection where indicated, air spading and tree protection fencing where required to address tree roots within the work area. 3. Field location and verification of existing site utilities and coordination with new electrical system installation. 4. Field location and coordination with all secondary electrical connections to identify and mitigate construction impacts, support and maintain temporary service during construction, and facilitate cutover from old service to new service. 5. Control and maintenance of vehicular and pedestrian traffic flow to maintain public access during the work of the contract.