Specifications include, but are not limited to: Provide Refractory Installation and Sandblasting Services for the Waste to Energy Facility (WTEF) located in Spokane, Washington at 2900 S Geiger Boulevard. In addition Contractor may be asked to perform miscellaneous repairs agreed upon by WTEF and Contractor. The Contractor must report to WTEF Control Room daily prior to performing any service Refractory Installation Services: refractory demo, tile installation, plastic ramming and miscellaneous non-code anchor welding. Sandblasting Services: Sandblasting of marked tube areas in boilers, convection cavity, superheater tube bundles, screen tubes and generator tubes. May also be required to perform other services such as Ultrasonic Testing (UT) readings, superheater lance cleaning and to facilitate welding.