Specifications include, but are not limited to: Elements of the Work include but are not limited to: Installation and maintenance of temporary erosion and sedimentation controls. Stripping and stockpiling existing outfield soil, removal of field under drainage and irrigation, tree protection, patch and repair of asphalt, removal of field light poles and luminaries, panel, removal and re-installation of existing drinking fountain. New field lighting poles, luminaries, junction boxes, and panel. New synthetic infield, outfield under-drainage, irrigation, amended outfield soil, new mechanically drilled seeding. New concrete pathways for ADA accessibility. Modifications to existing parking lot for accessibility which include parking lot striping, concrete, and curb. Stormwater filtration system, bioretention planters, and modifications to existing stormwater drainage.