Specifications include, but are not limited to: • Cleaning parking area for industry standard prep for sealcoating and striping. • Sealcoating (Including crack fill where needed) • Restriping and the addition of letters or numbers (18” high) to all parking stalls. Note, the current stall labels indicating parking for the Firs & BVC residents will not be relabeled. • Two stalls in front of pump out station on the lower level to be labeled as BVC Parking and loading zone striping and lettering are to be added in front of the kitchen access area. • Restripe & label current memory care visitor parking as an ADA parking area. Spaces must meet current ADA regulations for accessibility. • Contractor to repaint all accessible area logos, stalls, access aisles and loading zone. • Contractor to repaint all fire lanes including lettering No Parking and all associated red curbs. • Contractor to repair the curb in the upper parking lot. • Striping to be added to the dumpster area in the lower parking lot to indicate no parking. • Leveling and repaving small section of pavement in lower parking lot at kitchen entrance. • Contractor is responsible for cordoning off area(s) during job to prevent car traffic. • Phase the project: the lower parking lot to be done first, then the upper area for ease of access and egress for residents and staff. Coordinate schedule with BVC Facilities Manager.