Specifications include, but are not limited to: Total replacement of the existing water distribution system. New supply piping will be installed between the existing ground-well and water storage tanks. New distribution piping throughout the Mayfield Hydro Project primarily in existing road-beds connect to existing service pipes (i.e. 1-inch to 2-inch service lines that supply each building). While trenches are open for water pipe installation; conduits, communication vaults and electrical hand-holes will be installed to upgrade the infrastructure around the Mayfield Hydro Project. Six (6) fire hydrants will be installed throughout the Mayfield Hydro Project to bringit up to compliance with local fire regulations.