Specifications include, but are not limited to:Refer to the Basis of Design Report SEA IWTP Expansion dated June 23, 2023 for a detailed description of the project scope, as currently conceptualized. Aerated gravel beds (AGBs) have been chosen as the primary glycol treatment technology based on permit requirements and geological features near the airport. The consultant will have an opportunity to review and validate this Basis of Design before proceeding with the 30% Design. The Design Consultant’s scope of work will include, but not be limited to: validation of the Basis of Design Report, preparation and completion of design development documents as identified within the Tasks and Deliverables section below that meet Port standards and Rules for Airport Construction (RAC), commissioning activities, development of Operations & Maintenance Manuals, and construction support services for the following project scope of work for the IWTP Enhancements project: General Services to be Provided: A. Project coordination B. Site investigations C. Review existing project drawings and documentation D. Code and Permit review E. Design F. EasyPower system study G. Project and committee specific meeting attendance and contribution H. Construction documents I. CAD management and support