Specifications include, but are not limited to: 1. Install new shower in bathroom. 2. Install new Underlayment and vinyl in bathroom. 3. Remove and replace toilet in bathroom. 4. Re-install existing vanity and countertop. 5. Remove and replace bathroom sink faucet. 6. Clean-up. ; • Remove and dispose of existing shower, plumbing fixtures, and drywall around the shower. • Position the copper supply lines in the plumbing wall to center the mixing valve 16" in from the front edge of the shower panel, and 40" up from the base. If needed install new copper lines from the existing main line to ensure proper placement of the mixing valve. ; • Install the valve 16" from the front edge of the shower on the plumbing wall and 40" up from the shower base ; Furnish and install an 18” x 1-1/2” grab bar centered on both end wall’s and a 36” x 1-1/2” grab bar centered on the back wall; set the grab bars at 36” above the shower floor.