Specifications include, but are not limited to: The work to be performed by the CONSULTANT consists of preparing preliminary engineering design for constructing gaps in the Shared Use Path along the north side and Sidewalk along the south side of Highway 2 (US-2) from Hayford Road to Deer Heights Road. The proposed improvements include new ADA accessible pathway and sidewalk, drainage modifications to accommodate the path and sidewalk, and related work. This project does not have a mandatory DBE goal. The major features of the project are as follows: Approximately 615-feet of new 10-foot wide shared pathway. Approximately 1365 feet of new 5.5- foot asphalt sidewalk. Environmental documentation and preparation of permit applications. Minor drainage improvements to accommodate new path and sidewalk