Specifications include, but are not limited to: Project requirements include: 1. Meeting Executive Order 18-01 net-zero requirements (Attachment 7) 2. Tie into existing on site utilities: water, sewer, and power 3. Secure existing 8' x 30' hazardous material prefab container and concrete apron 4. Refuse area near hazardous material prefab container 5. Secure chain of custody storage area 6. Secure sample preparation/analysis lab 7. Eleven lockable field equipment storage areas utilizing open mesh wire partitions 8. Mezzanine area above vehicle storage area 9. East/west drive through access configuration for loading and trailer drop off 10. Secure, covered outdoor area for storage of 20 bicycles 11. Pallet Racks (4’x24’x4’ shelves high) 12. Unisex restroom 13. Wash-down area 14. Outdoor break area 15. Extension of the IT infrastructure via fiber optic cable 16. Site development including native and adaptive landscaping and irrigation similar to existing landscaping