Specifications include, but are not limited to: The Contractor shall furnish and install approximately 4,225 lineal feet of 54-inch and 363 lineal feet of 48-inch Cured-In- Place Pipe (CIPP) to rehabilitate existing sanitary sewer mains. The CIPP is to be designed as a structural liner for a fully deteriorated (as defined by ASTM F-1216, latest edition) sewer interceptor under gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with either thermal water or ultraviolet (UV) CIPP. This work will also include customer notification, bypass pumping, odor control, cure water treatment, cleaning, root and sediment removal, initial Closed-Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection.