The Cedar Grove 2, Building C, Roof Replacement project consists of a roof replacement at one (1) building with six (6) units located at 622-622 Jennings St. in the City of Sedro-Woolley. The building is a two(2) story structure. The typical existing roof construction consists of roof trusses, ½” sheathing, vapor barrier and asphalt shingles. The tenant population is comprised of families with children and will be occupied during the entire project. The Contractor must provide a safe, clean working environment. Since work will be mostly overhead, the Contractor will need to use caution tape, fencing, spotters and all other means to secure areas below work zones. This Roof Replacement Project is comprised of (but not limited to) demolition and replacement of all existing roofing, underlayment, vents, vent ridge structures, boots, fall arrest system, gutters, downspouts, fascia, barge boards, soffits and all appurtenances per plans, Specifications and Scope of Work. Roof Work to Include: Extend rafter tails (per plans and specifications) and re-sheath to create a continuous roof edge at each section. Infill ridge vent structures to match existing roof plane, replace barge boards, fascia and soffits. Replace areas of damaged roof sheathing, install new vapor barriers, underlayment and composite shingles, vents, boots, fall arrest system, gutters and downspouts tying into existing drain locations and all other work per Plans, Specifications and Scope of Work. These roof upgrades apply to all roofs located at 622-630 Jennings Street, Sedro Woolley 98284.