This design project will include but not limited to the scope required to: 1. Replace approximately 100 control panels that are dispersed throughout Concourses B, C, and D. The panel design will be the responsibility of Siemens, as per our Port of Seattle Sole source agreement. The panel layout for the design documents, will be only to the level required to complete the network design. The final panel design will be done during the construction phase as part of the construction contract. 2. Design the installation, connection, and commissioning of the fiber network throughout concourses B, C, and D to the newly replaced panels, any new required network switches and the previously installed network switches at approximately 3 points of connection in the main terminal area to create a fully connected fiber backbone.