The scope of work for this project consists of furnishing all labor, materials, and equipment necessary for the completion of the project identified in the Contract Drawings and within Specifications. This includes but is not limited to the protection of surrounding areas, prevention of contamination of adjacent water bodies, removal of existing creosote timber guide piles, their subsequent replacement, demolition of the existing boathouse (roof, floating docks, and utilities), installation of new floating docks with guide piles in its place, disconnection and reconnection of utilities associated with Boathouse #1, demolition of a section of concrete float of the adjacent concrete marginal walkway, and reconnection of utilities associated with the concrete section to be removed. Note, the floating docks will be fabricated by others. The Contractor will be responsible for floating the new docks into place, connecting them together, and securing their location with new guide piles.