Specifications include, but are not limited to: The scope of services is to prepare an in depth predesign study for the project in accordance with the Washington State Office of Financial Management (OFM) Predesign Manual. A copy of the OFM Predesign manual can be found here: https://www.ofm.wa.gov/sites/default/files/public/legacy/budget/instructions/predesign/2 016predesignmanual.pdf. The goal of the predesign is not to conceptually design the project, but rather to provide programming, options analysis, design, and cost framework which the eventual design-build team can use effectively, as well as to provide a compelling case for the funding of the project. The State has approved the University to spend a maximum of $500,000 on the pre-design project.