Specifications include, but are not limited to: 1. Mobilization and temporary facilities. 2. Removal and disposal of existing equipment and materials; preparation of subject areas to receive the Work, and installation of the Work. This may include, but is not limited to a. Demolition, salvage, recycling, and waste diversion in accordance with the requirements of Section 017419 Construction Waste Demolition and Disposal. b. Saw Cutting and Concrete Removal at Required excavations. Comply with the requirements of Section 024119 Selective Demolition. c. Concrete – Floor slab repairs and equipment pads for anchorage. Comply with the requirements of Section 033000 Cast-in-Place Concrete. d. Electrical Systems – Comply with the requirements of Division 26.