Specifications include, but are not limited to: Group 1 (Base Bid) This work consists of removing the existing asphalt portion of the driveway and reconstructing the driveway with concrete on 1st Street Court NE, Tacoma, per Contract details. Group 2 (Base Bid) This work consists of removing and reconstructing an existing concrete driveway and rolled curb and gutter on 64th Avenue East, Puyallup, per Contract details. Group 3 (Base Bid) This work consists of removing the existing asphalt portion of the driveway and reconstructing the driveway with concrete on 123rd Street East, Tacoma, per Contract details. Group 4 (Base Bid) This work consists of removing and reconstructing an existing concrete driveway and rolled curb and gutter on 161st Street Court East, Puyallup per Contract details. Group 5 (Base Bid) This work consists of removing the existing asphalt and reconstructing sidewalk driveway ramps and curb and gutter in concrete on Spanaway Loop Road South, Tacoma, per Contract details. Group 6 (Base Bid) This work consists of removing and reconstructing existing concrete sidewalk on 46th Avenue East, Spanaway, per Contract details. Group 7 (Base Bid) This work consists of removing and reconstructing existing concrete sidewalk and a portion of the cement concrete rolled curb and gutter on 225th Avenue Court East, Buckley, per Contract details.