The project will include:
All work to occur during normal business hours Monday through Sunday. All medical center activities will remain open throughout the duration of the construction. Contractor to ensure that all medical center activities remain unimpeded by construction activities.
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 648-20-121_Construct Campus Security Fence and Access Control (Vancouver) as required by drawings and specifications.
THIS PROJECT WILL CONSTRUCT A CAMPUS SECURITY FENCE
SURROUNDING THE VANCOUVER CAMPUS. THE NEW FENCE WILL BE
CONSTRUCTED WITH A CONCRETE MOW STRIP, TWO MOTORIZED VEHICLE
GATES, TWO PERSONNEL GATES, AND REPLACE THE EXISTING 6-FOOT
CHAIN-LINK FENCE.
A VEHICLE FORTIFICATION WILL BE INCLUDED FOR APPROXIMATELY
1100 LINEAR FEET OF PERIMETER FENCE ALONG FOURTH PLAIN BLVD.
STARTING APPROXIMATELY 100-FEET EAST FROM THE NORTHWEST CORNER
FOLLOWING THE PERIMETER EASTWARD. THIS FORTIFICATION IS
CONCRETE, 3-FEET TALL, AND SLOPED LIKE A JERSEY BARRIER ON THE
FOURTH PLAIN BLVD SIDE. FORTIFICATION TO BE DESIGNED TO STOP
AN IMPACT FROM A 4000 LB VEHICLE TRAVELING 30MPH. THE INTENT
IS FOR THE REPAIR OF THIS TYPE OF IMPACT TO BE LIMITED TO
SURFACE DAMAGE OF THE CONCRETE.
HEADLIGHT SCREENING IS INCLUDED FOR APPROXIMATELY 450-FEET
WHERE POW/MIA ROAD GETS CLOSE TO FOURTH PLAIN BLVD.
CAMERA SYSTEM FOR THE WHOLE PERIMETER FENCE WILL USE DESIGNED
RACEWAYS.