Restoration of road panels, sidewalk, curb ramp, and any SDOT required striping on Yesler Way at approximately 721 Yesler Way. (see attached Drawing “Attachment B.2 Yes Farm Water Service (Co-Op) Water Service Site Plan”). Quantities should be estimated off the drawings and field measurements. We prefer the proposers to do their own estimates based on the extent shown on the drawings. All work needed to: remove the damaged concrete road panel, sidewalk, bike path, and curb ramp and replace in accordance with Seattle Department of Transportation requirements. This work includes, but is not limited to: • Orchestrating any required COS Inspections. • All ROW work must be coordinated with SDOT HUB. • Provide and coordinate all SDOT required traffic, bike, and pedestrian control requirements, including design and permitting of traffic control plan, required signage and barriers, labor, flaggers, UPO’s. • Saw cutting and demolition and disposal of waste materials. • Repair or placement of any required subbase to a dense and unyielding condition. • Coordination of any required testing of materials. • Placement of reinforcement or other materials required by SDOT. • Placement of concrete road panels, sidewalk, bike path, and curb ramp. • Protection of work in place. • Any required saw cuts or expansion joints. • Any paint or stripping required by SDOT. • Any safety requirements required by SDOT • Prevention of environmental pollution and preservation of natural resources per local regulations and Yesler PAO. • The street right-of-way, material storage sites, construction staging areas, and all other areas affected by the work must be left neat and presentable and must be fully restored as necessary according to this Rule, and as required by Standard Specifications, Sections 1-04.11 and 1-07.13.