Specifications include, but are not limited to: VE circuit should be installed at the same location where the existing circuit is located, Telecom/LAN room SE-113, first floor, Centennial 1 bldg, near/behind the loading dock; refer to the attached site map (DSHS5007 LAN Rm_Floor Map.pdf). Demarc/vendor NID/Ethernet switch to be located no further than 10 feet from DSHS router and all ports should have a copper handoff to customers.; Demarc/NID/Ethernet switch to be located no further than 10 feet from DSHS router. The circuit needs to be terminated in Building C, First Floor, Room A164, Rack 1. Please coordinate with local point of contact for exact rack placement. Refer to the attached floor plan (DSHS6142 -Telecom BLDG C - 48 Bed RTF_ Floor Plan.pdf).; Demarc/NID/Ethernet switch to be located no further than 10 feet from DSHS router. The circuit needs to be terminated/copper handoff in the LAN room, same location as the existing circuit. Refer to the attached site map (DSHS3053-Mount Vernon Floor map - LAN room 20170720_v2.pdf). This is an Area Agency on Aging (AAA) site. Refer to the local point of contact for building contact information.; Install extended copper handoff to 2nd flr, Room 208, within 10ft of customer router. Same location as existing circuit. Building is owned by Office of the Secretary of State.