The purpose of this solicitation is to obtain quotes from qualified businesses to provide and install Direct Digital Controls (DDC) in accordance with attached specifications. To maintain continuity of operations, the new Distech DDC system must be constructed prior to decommissioning the existing controls system. All equipment must remain fully operational until it is scheduled for decommissioning. Once each piece of equipment is taken offline from the existing DDC, that equipment must be integrated into the new Distech system. New Distech control panels must be built and programmed in advance of cutovers, allowing for efficient system transitions and reduced downtime. This work will be done at the following location: